Skip to main content

🚀🚀New Feature: Student CSV Upload System🚀🚀

What's New

We've introduced a brand new student upload system that allows administrators to bulk import student lists via CSV files. This powerful new feature streamlines student onboarding and eliminates manual data entry.

Key Features

  • CSV template download - Get standardised templates to ensure data consistency

  • Drag-and-drop upload - Simply drag your CSV file to the upload area

  • 3-step guided process - Upload → Match → Review workflow

  • Field mapping - Automatically match your data columns to student meta data form

  • Data validation - Built-in validation helps catch errors before import

  • Bulk processing - Import hundreds (or thousands!) of students in one operation

How It Works

  1. Download Template - Get the CSV template with required fields

  2. Upload CSV - Drag and drop your filled CSV file

  3. Match Fields - Review and confirm field mappings

  4. Review & Import - Final check before bulk import